Project information
- Category: Full Home Renovations
- Client: Lip Properties
- Project date: 16 September, 2020
Bungalo Split into 2 SDUs
During the evaluation process we saw a big potential for this home after proposed renovation ideas. This run down house required full interior renovations.
- Remodelling of the kitchen and the kitchen powder room space to create separate enclosure for the hot water tank and laundry appliances.
- Large master bedroom split and addition of in-suite bathroom.
- Second floor bathroom addition.
- Second floor bedrooms renovations.
- Family room renovations.
- Front porch remodel and renovation.
- All Windows Supply and Install.